Skip to content

Location

Rock mass classification for NCTIR slopes

Rock mass classification for NCTIR slopes

The North Canterbury Transport Infrastructure Recovery (NCTIR) has been set-up by the government under the Hurunui/Kaikoura Earthquakes Recovery Act 2016. Its purpose is to repair and re-open the earthquake-damaged road and rail networks between Christchurch and Picton by the end of 2017. This includes the…

Geotechnical Engineering in the Road/Rail Corridor on the Kaikoura Coast

Geotechnical Engineering in the Road/Rail Corridor on the Kaikoura Coast

NCTIR Geotechnical Team The North Canterbury Transport Infrastructure Recovery (NCTIR) has been set-up by the government under the Hurunui/Kaikoura Earthquakes Recovery Act 2016. Its purpose is to repair and re-open the earthquake-damaged road and rail networks between Christchurch and Picton by the end of 2017….

SPECIAL FEATURE Kaikoura EQ update

SPECIAL FEATURE Kaikoura EQ update

As we were once again reminded in November 2016, New Zealand is a very dynamic country. Being a country with a relatively small area, such a large earthquake will inevitably affect our infrastructure and a wide variety of intensive and non-intensive land use. This provides…