
Pre-excavation grouting for groundwater ingress control in tunnelling – Auckland, New Zealand.
Abstract Water ingress into a mined tunnel can be an issue – not just for construction but also for depressurisation and the potential consequential surface settlement. The Waterview Connection in Auckland has twin ~14.5m diameter TBM tunnels linked by 16 mined cross passages. Each cross…