New resilient bridge on liquefiable ground over the Ōpaoa River, Blenheim
New resilient bridge on liquefiable ground over the Ōpaoa River, Blenheim H.A. Hendrickson, G. J. Saul & P. Brabhaharan WSP, New Zealand. ABSTRACT A 190 m long, 2-lane bridge has been constructed over the Ōpaoa River on SH1, Blenheim. The bridge is in an area of…