Skip to content

The Tauranga Harbour Link project represents a major upgrade of the existing harbour crossing and approaches. It comprises a two lane incrementally launched bridge and major viaduct structure spanning road and rail links. This paper presents the details of the pile construction methodology using bentonite support fluid and presents a preliminary assessment of a load test on an instrumented preliminary pile.

Downloads
Published
09/01/2008
Collection
Issue
1
Volume
34
Type
ISSN
0111-9532